Source geometries and observations are research references. Geometry scaling, varying wind conditions and electrical load modelling are scenarios—not further experimental observations.
SECTION B / ENERGY PATH
Follow the energy.
Turbine torque and generator electrical load together determine the operating point.
WindSpeed and swept area
→
RotorAvailable shaft power and torque
→
DrivetrainDirect drive or ratio
→
GeneratorElectrical loading torque
→
Battery / loadPredicted electrical output
Engineering distinction: a turbine’s peak power coefficient does not independently fix its operating RPM. The rotor and connected load must be considered together.
SECTION C / NOTEBOOK ROADMAP
Engineering Steps 01–07.
All seven engineering steps are now available. Follow your selected rotor and generator from aerodynamic evidence through tuning, EM braking, controller rules and the mechanical build reference.
01
Rotor aerodynamics
Inspect the selected rotor’s published Cp–TSR evidence and supported configurations.
The models and their evidence limits remain unchanged by this roadmap. Exploratory braking, electrical estimates and high-wind extrapolations are not verified operating or safety predictions. Warlock Engineering privacy policy.